The Wolfson Centre for Bulk Solids Handling Technology Port of Vancouver USATBA GroupCleveland Cascades LtdPort of StocktonPort of South Louisiana
  • TBA Group
  • Sailors Society
  • Vigan
  • Port of South Louisiana
  • The Wolfson Centre for Bulk Solids Handling Technology
  • Cleveland Cascades Ltd

thyssenkrupp ships ore handling system

thyssenkrupp ships ore handling system

(Posted on 03/09/19)

thyssenkrupp Industrial Solutions is developing and building a new materials handling

system for one of the most remote and challenging locations in the world: an iron ore port in

northern Canada. Recently, the first plants were shipped completely pre-assembled from

Bremerhaven, Germany, to Baffin Island.

Baffinland Iron Ore Mines Corporation's (Baffinland's) Mary River mine is one of the world's

richest iron ore deposits with iron contents more than 65 percent. At the same time, the port

on Baffin Island is one of the most demanding locations in the world. It is only free of ice and

accessible to shipping between the end of July and the beginning of October. With

thyssenkrupp's new material handling system Baffinland aims to triple its material handling

capacity to 12 million tons of iron ore per year. The project generates a major potential for

the economic development of the region and will create jobs for the local population.

Christof Brewka, Head of Materials Handling at thyssenkrupp Industrial Solutions: “Ambitious

projects like this require a deep understanding of local conditions, close collaboration with

the client and efficient global project management. One of our strengths is that we can bring

together our experts at different locations around the world. Teams from Germany, Canada

and the USA have pooled their know-how to develop the best solution for Baffinland. At the

same time, our proven technologies will guarantee the highest productivity even under

extreme climatic conditions.”

thyssenkrupp supplies a complete system for the processing, storage and transport of iron

ore. This includes a complete railcar unloading station, a crushing and screening plant, a

stockpile system including a combined stacker/reclaimer, a ship loader as well a conveyor

plant connecting all components. Due to the difficult logistical and climatic conditions on site,

the plants are pre-assembled at a total of four locations in Europe, Canada and the Middle

The first delivery including a crusher, a screening system and a railcar unloading station was

shipped from Bremerhaven to Canada in July 2019. While the railcar unloading station was

preassembled in Stettin and transported to Bremerhaven, the crushing and screening system

was assembled in Bremerhaven. The crusher building is 23.5 meters wide, 33 meters high

and weighs 1,470 tons. The screen building is 30 meters wide, 34 meters high and weighs

almost 1,800 tons. The BigLift Barentsz reached port on Baffin Island with its roughly 5,500

ton freight in the beginning of August. Two more cargo ships are scheduled to deliver

conveyors during the current shipping season. The remaining units will be delivered in 2020.

When it goes into operation in 2021, the system will crush, screen and store the ore produced

in the Mary River Mine all year round and load it onto Panamax or Capesize ships during the

ice-free season. For example, the system can fully load a Capesize ship in just one day.

Few people outside Canada know much about Baffin Island, the fifth largest island in the

world with a surface area of over 500,000 km (almost 1.5 times the size of Germany) and a

population of under 12,000. One reason for the low population figure is the harsh climate

roughly 600 kilometers north of the Arctic Circle. Spring arrives in mid-July and winter returns

in September. Baffinland Iron Ore Mines operates the Mary River Mine at the northern end of

Baffin Island in the Canadian Nunavut territory. At a latitude of around 72°, it is one of the

northernmost mines in the world and has been producing high-quality iron ore for 12 months

a year since 2015. The ore is transported from the mine to Milne Inlet port on the northern

coast around 100 kilometers away. As part of the overall project, this transportation will be

converted from road to rail.

Latest News

ABB Azipod debuts in Oldendorff bulk ship delivery

(Posted on 19/01/21)

China’s Chengxi Shipyard has handed over the first of twin self-unloading transshipment newbuilds... Read more


GDI launches ROV in water asset assessments

(Posted on 19/01/21)

Global Drone Inspection (GDI), the new subsidiary company of robotic inspection specialists RIMS BV,... Read more


AMS bulker largest ship to perform automated docking

(Posted on 14/01/21)

Wärtsilä Voyage has introduced Wärtsilä SmartMove Suite to the global shipping market... Read more


CTI Maritec integration creates focused service

(Posted on 14/01/21)

Maritec Pte Ltd, the fuel and oil testing services company acquired by leading certification company... Read more


U.S. Coast Guard approval for Alfa Laval

(Posted on 10/01/21)

The U.S. Coast Guard (USCG) have issued its type approval for Alfa Laval PureBallast 2. Most owners... Read more


Rivertrace’s new digitalisation white paper

(Posted on 10/01/21)

In the midst of digital technology continuously changing the landscape of the international shipping... Read more


DisinfectYour.com extends COVID cleaning

(Posted on 05/01/21)

Rotterdam-based company DisinfectYour.com has launched a new service to help vessel owners and crew... Read more


New research and innovation project announced

(Posted on 05/01/21)

Current Direct, a new research and innovation project funded by the European Commission’s Horizon... Read more


KVH Partners with ioCurrents

(Posted on 28/12/20)

Data analytics innovator ioCurrents will offer KVH Watch connectivity as part of their vessel maintenance... Read more


Thordon concerns over VIDA changes

(Posted on 22/12/20)

Thordon Bearings has added to the growing concern over proposed changes to Vessel Incidental Discharge... Read more


ViganTOC EventsCimbriaBühler GmbHTelestackSailors Society
  • Bühler GmbH
  • Port of Stockton
  • TOC Events
  • Telestack

Subscribe to our newsletter

Keep up to date with the latest global news in bulk cargo handling and shipping