Port of StocktonTMS Awards 2023Sailors SocietyGeneva DryCimbriaPort of South Louisiana
  • Geneva Dry
  • TMS Awards 2023
  • Van Aalst
  • Telestack
  • Cimbria
  • Bühler GmbH

Rio Tinto first quarter production results

 Rio Tinto first quarter production results

(Posted on 18/04/19)

Rio Tinto chief executive J-S Jacques has said, on the release of first quarter production results, “Our iron ore business faced several challenges at the start of this year, particularly from tropical cyclones. As a result, and following the continuing assessment of damage at the port resulting from the cyclones and other minor disruptions, 2019 guidance for Pilbara shipments is reduced to between 333 and 343 million tonnes. The quarterly operational performance in our other products was solid, generally higher than last year. Our focus remains on safety, delivering our ‘value over volume’ strategy and allocating capital with discipline, to continue delivering superior returns to our shareholders in the short, medium and long term.”

Operational update:

  • Pilbara iron ore shipments of 69.1 million tonnes (100 per cent basis) in the first quarter were 14 per cent lower than the first quarter of 2018. Production was significantly impacted by the weather disruptions in March and a fire at Cape Lambert A in January. These events will have an impact on second quarter performance.
  • 2019 guidance for Pilbara shipments has been revised to between 333 and 343 million tonnes (previously between 338 and 350 million tonnes, 100 per cent basis). The reduction reflects a slower ramp up and ongoing disruption to shipments caused by weather and other disruptions.
  • Commissioning of the Amrun bauxite mine was completed in March 2019, with the project delivered under budget and ahead of schedule. Bauxite production of 12.8 million tonnes in the quarter was one per cent higher than the same period of 2018, despite several weather events throughout the quarter significantly impacting production at the Amrun, Weipa and Gove mines.
  • Aluminium production of 0.8 million tonnes was in line with the first quarter of 2018. Excluding the non-managed Becancour smelter, which was impacted by a lock-out, production was one per cent higher, reflecting continued productivity creep.
  • First quarter mined copper production of 144 thousand tonnes was three per cent higher than the first quarter of 2018, with strong contributions from Oyu Tolgoi and Rio Tinto Kennecott.
  • Titanium dioxide slag production of 296 thousand tonnes was one per cent higher than the first quarter of 2018.
  • First quarter production at Iron Ore Company of Canada was five per cent higher than the corresponding quarter of 2018, despite adverse weather conditions impacting production in February.
  • At the Oyu Tolgoi Underground Project the review of the mine design and the development schedule is continuing. The commissioning of the main production shaft (Shaft 2) is now expected to complete in October 2019.
  • On 27 February 2019, Rio Tinto announced it had discovered copper-gold mineralisation in the Paterson Province in the far east Pilbara region of Western Australia.
  • On 8 April 2019, Rio Tinto announced the approval of the construction of the Zulti South project at Richards Bay Minerals (RBM) in South Africa for $463 million (Rio Tinto share $343 million).
  • On 15 April 2019, Rio Tinto announced it had committed $302 million ($166 million Rio Tinto share) of additional expenditure to advance its Resolution Copper project in the US state of Arizona

Latest News

ADM and Bayer collaboration help farmers achieve lower carbon emissions

(Posted on 19/06/24)

 ADM and Bayer have announced an extension of their collaboration, working with farmers in a bid... Read more


US House appropriations bill includes reinstatement of NASS reports

(Posted on 14/06/24)

A House appropriations subcommittee in the USA has approved its Fiscal Year 2025 bill that includes... Read more


Rio Tinto to acquire Mitsubishi’s stake in Boyne aluminium smelter

(Posted on 14/06/24)

Rio Tinto has agreed to acquire Mitsubishi Corporation’s 11.65% interest in Boyne Smelters Ltd... Read more


Richards Bay Minerals’ renewable energy agreement

(Posted on 07/06/24)

Richards Bay Minerals (RBM) has signed a renewable power purchase agreement (PPA) with Khangela Emoyeni... Read more


Trafigura half year result show core business strength

(Posted on 07/06/24)

Trafigura Group Pte Ltd, a market leader in the global commodities industry, has released its 2024 Half... Read more


New Zealand aluminium smelter’s future secured with power deals

(Posted on 01/06/24)

New Zealand Aluminium Smelters (NZAS) has signed 20-year electricity arrangements that secure the future... Read more


NGFA statement on farm bill advanced by House Ag Committee

(Posted on 31/05/24)

The House Agriculture Committee in the USA have advanced a farm bill that includes several important... Read more


Rio Tinto and BHP collaborate on electric trucks in the Pilbara

(Posted on 28/05/24)

In an industry first, Rio Tinto and BHP will collaborate on the testing of large battery-electric haul... Read more


KEZAD signs lease agreement with Ducab Metals Business

(Posted on 28/05/24)

KEZAD Group, the largest operator of integrated and purpose-built economic zones, and Ducab Metals Business... Read more


Anglo American simplifies portfolio of copper, premium iron ore and crop nutrients assets

(Posted on 22/05/24)

Anglo American plc is setting out a clear, compelling and decisive plan to unlock significant value... Read more


ViganVan AalstTelestackTBA GroupBühler GmbH
  • Port of South Louisiana
  • TBA Group

Subscribe to our newsletter

Keep up to date with the latest global news in bulk cargo handling and shipping