Sailors SocietyTBA GroupViganGeneva DryTelestackPort of South Louisiana
  • Bühler GmbH
  • Geneva Dry
  • Port of South Louisiana
  • Van Aalst
  • Port of Stockton
  • Vigan

Gladstone hydrogen pilot plant to trial lower-carbon alumina refining

Gladstone hydrogen pilot plant to trial lower-carbon alumina refining

(Posted on 14/07/23)

Rio Tinto and Sumitomo Corporation will build a first-of-a-kind hydrogen plant in Gladstone, Australia, as part of a A$111.1 million programme aimed at lowering carbon emissions from the alumina refining process.

The Yarwun Hydrogen Calcination Pilot Demonstration Programme received the green light after a A$32.1 million co-funding boost from the federal government’s Australian Renewable Energy Agency (ARENA).

The program is aimed at demonstrating the viability of using hydrogen in the calcination process, where hydrated alumina is heated to temperatures of up to 1,000 degrees Celsius.

It involves construction of a hydrogen plant at the refinery and the retrofit of refinery processing equipment. If successful, the program could pave the way for adoption of the technology at scale globally.

Rio Tinto Aluminium Pacific Operations Managing Director Armando Torres said “This pilot plant is an important step in testing whether hydrogen can replace natural gas in Queensland alumina refineries.

“At Rio Tinto we have put the energy transition at the heart of our business strategy, and this is one of the ways we’re working towards decarbonising our operations.

“We are proud to be developing this new technology here in Gladstone, in partnership with Sumitomo Corporation, and with support from ARENA.”

The project will consist of construction of a 2.5MW on-site electrolyser to supply hydrogen to the Yarwun refinery and a retrofit of one of Yarwun’s four calciners so it can operate at times with a hydrogen burner.

The trial is expected to produce the equivalent of about 6,000 tonnes of alumina per year while reducing Yarwun’s carbon dioxide emissions by about 3,000 tonnes per year.

Converting the entire plant to green hydrogen could reduce emissions by 500,000 tonnes per year, which is the equivalent of taking about 109,000 internal combustion engine cars off the road.

Construction will start in 2024. The hydrogen plant and calciner are expected to be in operation by 2025.

Sumitomo Corporation will own and operate the electrolyser at Yarwun site and supply the hydrogen to Rio Tinto directly. The electrolyser will have a production capacity of more than 250 tonnes of hydrogen annually.

Sumitomo Corporation Energy Innovation Initiative Director, Seiji Kitajima said “We are excited to be delivering this hydrogen project together with Rio Tinto as our long-term partner with the support of ARENA.

“Demonstrating real-world applications of hydrogen in industrial settings with motivated partners is essential to reducing carbon emissions and working toward our company’s vision of achieving carbon neutrality by 2050. Through this demonstration, Sumitomo Corporation aims to venture into the commercialisation project to contribute to Rio Tinto’s decarbonisation.”

“Sumitomo Corporation is proud to be working on yet another hydrogen project in Australia and contributing to Australia’s own emission reductions goals.”

The pilot plant follows the success of a A$1.2 million feasibility study co-funded by Rio Tinto and ARENA that was announced in 2021.

Rio Tinto is committed to achieving net zero emissions by 2050 and has targets to reduce Scope 1 & 2 emissions by 50% by 2030 from 2018 levels.

Latest News

NGFA applauds reintroduction of HAULS Act

(Posted on 24/12/25)

The National Grain and Feed Association (NGFA) has applauded Senator Deb. Fischer’s (R-Neb.) reintroduction... Read more


Anglo American and Teck receive approval for merger of equals

(Posted on 18/12/25)

Anglo American plc and Teck Resources Limited have received regulatory approval from the Government... Read more


Rhodes Ridge $191m feasibility study on Pilbara iron ore mine

(Posted on 18/12/25)

The Rhodes Ridge Joint Venture has approved a $191 million (A$294 million) (Rio Tinto share $96 million... Read more


Strong metals trading as Trafigura publishes annual results

(Posted on 09/12/25)

Trafigura Group Pte Ltd, a global leader in the commodities industry, has announced its financial results... Read more


Rio Tinto’s Nuton technology produces first copper

(Posted on 09/12/25)

Rio Tinto has successfully produced the first copper from the Johnson Camp mine in Arizona using its... Read more


US soy and Uzbekistan sign MoU to expand trade

(Posted on 02/12/25)

The American Soybean Association’s World Initiative for Soy in Human Health programme and the... Read more


KNAC and Rio Tinto sign updated agreement

(Posted on 02/12/25)

Karlka Nyiyaparli Aboriginal Corporation (KNAC) Registered Native Title Body Corporate and Rio Tinto... Read more


OCI Global announces sale of OCI Ammonia Holding to AGROFERT

(Posted on 02/12/25)

OCI Global, a leading global producer and distributor of nitrogen products has announced that it has... Read more


Court of Appeal confirms permit for new steel plant in Luleå

(Posted on 24/11/25)

In December 2024, SSAB was granted a permit by the Land and Environment Court at Umeå District... Read more


Simandou partners celebrate start of operations

(Posted on 15/11/25)

The President of the Republic of Guinea has joined project partners WCS1, Baowu, Chinalco and Rio Tinto... Read more


CimbriaVan AalstPort of StocktonBühler GmbH
  • Sailors Society
  • Telestack
  • Cimbria

Subscribe to our newsletter

Keep up to date with the latest global news in bulk cargo handling and shipping