Sailors SocietyGeneva DryTelestackVan AalstPort of StocktonPort of South Louisiana
  • Geneva Dry
  • Vigan
  • Van Aalst
  • Telestack
  • Sailors Society
  • Port of South Louisiana

Gladstone hydrogen pilot plant to trial lower-carbon alumina refining

Gladstone hydrogen pilot plant to trial lower-carbon alumina refining

(Posted on 14/07/23)

Rio Tinto and Sumitomo Corporation will build a first-of-a-kind hydrogen plant in Gladstone, Australia, as part of a A$111.1 million programme aimed at lowering carbon emissions from the alumina refining process.

The Yarwun Hydrogen Calcination Pilot Demonstration Programme received the green light after a A$32.1 million co-funding boost from the federal government’s Australian Renewable Energy Agency (ARENA).

The program is aimed at demonstrating the viability of using hydrogen in the calcination process, where hydrated alumina is heated to temperatures of up to 1,000 degrees Celsius.

It involves construction of a hydrogen plant at the refinery and the retrofit of refinery processing equipment. If successful, the program could pave the way for adoption of the technology at scale globally.

Rio Tinto Aluminium Pacific Operations Managing Director Armando Torres said “This pilot plant is an important step in testing whether hydrogen can replace natural gas in Queensland alumina refineries.

“At Rio Tinto we have put the energy transition at the heart of our business strategy, and this is one of the ways we’re working towards decarbonising our operations.

“We are proud to be developing this new technology here in Gladstone, in partnership with Sumitomo Corporation, and with support from ARENA.”

The project will consist of construction of a 2.5MW on-site electrolyser to supply hydrogen to the Yarwun refinery and a retrofit of one of Yarwun’s four calciners so it can operate at times with a hydrogen burner.

The trial is expected to produce the equivalent of about 6,000 tonnes of alumina per year while reducing Yarwun’s carbon dioxide emissions by about 3,000 tonnes per year.

Converting the entire plant to green hydrogen could reduce emissions by 500,000 tonnes per year, which is the equivalent of taking about 109,000 internal combustion engine cars off the road.

Construction will start in 2024. The hydrogen plant and calciner are expected to be in operation by 2025.

Sumitomo Corporation will own and operate the electrolyser at Yarwun site and supply the hydrogen to Rio Tinto directly. The electrolyser will have a production capacity of more than 250 tonnes of hydrogen annually.

Sumitomo Corporation Energy Innovation Initiative Director, Seiji Kitajima said “We are excited to be delivering this hydrogen project together with Rio Tinto as our long-term partner with the support of ARENA.

“Demonstrating real-world applications of hydrogen in industrial settings with motivated partners is essential to reducing carbon emissions and working toward our company’s vision of achieving carbon neutrality by 2050. Through this demonstration, Sumitomo Corporation aims to venture into the commercialisation project to contribute to Rio Tinto’s decarbonisation.”

“Sumitomo Corporation is proud to be working on yet another hydrogen project in Australia and contributing to Australia’s own emission reductions goals.”

The pilot plant follows the success of a A$1.2 million feasibility study co-funded by Rio Tinto and ARENA that was announced in 2021.

Rio Tinto is committed to achieving net zero emissions by 2050 and has targets to reduce Scope 1 & 2 emissions by 50% by 2030 from 2018 levels.

Latest News

GSC launches mining advisory division, strengthening global investment capabilities

(Posted on 10/11/25)

GSC (Global Strategic Commodities) has announced the launch of its dedicated mining advisory division... Read more


SSAB issues first green bonds amounting to SEK2,800m

(Posted on 10/11/25)

SSAB AB has successfully issued its inaugural green bonds under its EUR 2 billion EMTN programme, dated... Read more


Anglo American publishes shareholder circular for merger with Teck

(Posted on 10/11/25)

On 9 September 2025, Anglo American plc and Teck Resources Limited announced that they had reached an... Read more


Bunge closes agreement to acquire NWT grain elevator assets

(Posted on 04/11/25)

Bunge has successfully closed its purchase agreement for the grain elevator assets of North West Terminal... Read more


NGFA applauds Senate committee for advancing Grain Standards Act reauthorisation

(Posted on 27/10/25)

The National Grain and Feed Association (NGFA) in the USA has applauded the Senate Agriculture Committee... Read more


Rio Tinto announces board changes.

(Posted on 24/10/25)

As Rio Tinto previously reported, the size of its Board peaked at 14 Directors during a transitional... Read more


ADM advances quality capabilities with new central milling laboratory

(Posted on 24/10/25)

ADM , a global leader in human and animal nutrition, has celebrated the opening of its new Central Milling... Read more


Bunge announces reporting segment changes and recast outlook

(Posted on 20/10/25)

Bunge Global SA has announced that it has changed its segment and volume reporting to align with the... Read more


Open Trade Coalition calls for bold and open EU trade policy

(Posted on 20/10/25)

As the European Parliament prepares for the confirmation hearings of the new Commissioners, the Open... Read more


Rio Tinto Q3 results show strong production across the portfolio

(Posted on 14/10/25)

Multinational mining company, Rio Tinto, has releases its third quarter 2025 production results showing... Read more


ViganCimbriaBühler GmbHTBA Group
  • Port of Stockton
  • TBA Group
  • Cimbria

Subscribe to our newsletter

Keep up to date with the latest global news in bulk cargo handling and shipping