

(Posted on 08/02/23)
The technology group Wärtsilä has successfully retrofitted an inline shaft generator system on the ‘Berge Toubkal’, a cape-size bulk carrier owned by Singapore-based Berge Bulk. This is the marine industry’s first-ever shaft generator retrofit, and its successful completion will improve the vessel’s Energy Efficiency Existing Ship Index (EEXI) while reducing overall carbon footprint.
Shaft generator systems onboard ships are driven by the main engine to supply power to the mains, thus saving fuel and emissions. They are sized to eliminate the need to operate auxiliary engines while at sea. While such systems, also referred to as Power Take-Off (PTO) systems, are today’s standard installations on newbuild vessels, large inline versions with the generator sitting directly on the propeller shaft and turning at 50 to 100 rpm have never before been retrofitted.
“Berge Bulk made an industry commitment to go carbon neutral well before the IMO’s plan, and we are installing now the latest fuel-saving technologies, like shaft generators, air lubrication, or wind propulsion on our vessels,” says Paolo Tonon, Berge Bulk’s Technical Director, “Wärtsilä has a proven track record and is one of the market leaders in shaft generator systems and electrical integration.”
“Berge Bulk is one of the front runners in shipping’s transition to decarbonised operations, and we are proud to support them in this. Wärtsilä is actively working on the development of new technologies that can be integrated into existing vessel systems to make their operations cleaner and more economical,” says Torsten Büssow, Director for Ship Electrification at Wärtsilä.
The retrofitted shaft generator will also provide power to an air lubrication system installed at the same time. The system includes a Wärtsilä control system, as well as a converter to allow the generator to operate over a broad span of rpm. The existing intermediate shaft and bearings were replaced to accommodate the increased weight.
Wärtsilä has successfully delivered more than 650 shaft generator systems and has over 50 years of experience in this field.
The ‘Berge Toubkal’ retrofit was completed in Q4 2022, following ten months of preparation time.
INTERCARGO, the International Association of Dry Cargo Shipowners, reports encouraging progress in bulk... Read more
Marcura and Dataloy Systems have announced a new phase in their long-standing strategic partnership... Read more
According to DNV’s latest report, Maritime Safety Trends 2014-2024 - Preparing for future risks... Read more
The second of three Damen Combi Freighters (CF) 3850 has been launched in China for Fast Lines Belgium... Read more
Inclusion is every bit as important as diversity in ensuring that shipping becomes a truly welcoming... Read more
AXSMarine, a pioneer and market leader in the provision of advanced solutions and market intelligence... Read more
Veson Nautical, a global leader in maritime data and freight management solutions, and The Great Eastern... Read more
Columbia Group has welcomed the UK government’s announcement to link its emission trading system... Read more
Damen Shipyards Group, together with partners including Atal Solutions has completed its retrofit of... Read more
NORDEN has announced that it has signed agreements for two additional 17,500 dwt Multi-purpose (MPP)... Read more