Geneva DryTelestackBühler GmbHSailors SocietyCimbriaVigan
  • TBA Group
  • Sailors Society
  • Port of South Louisiana
  • Bühler GmbH
  • Port of Stockton
  • Vigan

Rio Tinto details on tailings facilities

(Posted on 17/06/19)

Rio Tinto has disclosed additional information in relation to its global tailings facilities at www.riotinto.com/tailings. The latest disclosure builds on the detailed information provided on each of the company's global tailings facilities on 20 February 2019, when Rio Tinto also published its Group Procedure and its Standard for 'Management of tailings and water storage facilities', which was introduced in August 2015.

In line with the company's commitment to disclose further detail over time, Rio Tinto has now provided additional information about the construction, management and monitoring of facilities, including independent reviews.

All Rio Tinto managed facilities are subject to three levels of governance and assurance:

  • First level of assurance takes place at the asset itself with the main tenets being effective facility design, comprehensive operational controls and regular reviews. Independent reviews of the operations must be conducted at least every two years
  • Second level is assurance to the Rio Tinto Standard through periodic Business Conformance Audits and Technical Reviews, supported by Rio Tinto's Surface Mining Centre of Excellence
  • Third level of assurance is independent of site management and normally conducted by third parties

All Rio Tinto managed facilities, whether active or inactive, have an external engineer of record or design engineer.

In order to align with guidance from the International Council on Mining & Metals (ICMM) some of the information previously disclosed has been updated. This includes limiting the status classifications of facilities to 'active', 'inactive' or 'closed', and ensuring the construction method specified describes the most recent type of embankment raise on the facility. In addition, following a comprehensive review of Rio Tinto's global operations by the company's technical teams, some facilities have been reclassified resulting in some tailings facilities being added to the list and others being removed.

All facilities have been given a hazard classification in accordance with the regulatory or industry body that oversees tailings in each region or jurisdiction.

Hazard classifications are not a judgment on the condition of a facility or the likelihood of failure but on the potential consequence if there were to be a failure.

Full details of all Rio Tinto tailings and water storage facilities are available at https://www.riotinto.com/tailings.

Latest News

SSAB delivers decarbonised steel to Vattenfall’s solar park project in Germany

(Posted on 29/05/26)

SSAB is supplying decarbonised steel to Vattenfall for the construction of the ground-mounted solar... Read more


NGFA statement on STB’s decision to conditionally accept rail merger application

(Posted on 29/05/26)

In accordance with the Surface Transportation Board’s merger rules, the Board has conditionally... Read more


EU feed production market forecast highlights continued stability

(Posted on 25/05/26)

FEFAC market experts are forecasting continued stability in the EU compound feed production market for... Read more


Fertilizer Action Plan: recognition must now translate into delivery

(Posted on 22/05/26)

Fertilizers Europe has acknowledged the European Commission’s Fertilizer Action Plan, which recognises... Read more


Tripartite MOU to establish direct U.S.–DRC cobalt supply chain

(Posted on 14/05/26)

Entreprise Générale du Cobalt, EVelution Energy LLC and Trafigura Pte Ltd. has announced... Read more


Commissioning of Oxelösund electric arc furnace delayed due to permitting

(Posted on 14/05/26)

SSAB’s conversion of the mill in Oxelösund to fossil-free production is being delayed due... Read more


YEC agreement supports decarbonisation of Rio Tinto’s Pilbara iron ore operations

(Posted on 11/05/26)

Yindjibarndi Energy Corporation (YEC), one of Australia’s largest Indigenous-led renewable energy... Read more


ASA Vice President urges caution in USTR Section 301 investigation

(Posted on 11/05/26)

Soybean farmers are already facing significant economic headwinds and new trade actions could add further... Read more


ADM investment to upgrade Clinton, Iowa, corn processing facility

(Posted on 11/05/26)

ADM, a global leader in innovative solutions from nature, has announced a multimillion-dollar investment... Read more


JV in Bayuquan, China to strengthen global raw material supply chains

(Posted on 04/05/26)

CREMER ERZKONTOR GmbH has announced the official opening of its joint venture, CREMER (Yingkou) Supply... Read more


TBA GroupVan AalstPort of StocktonPort of South Louisiana
  • Cimbria
  • Geneva Dry

Subscribe to our newsletter

Keep up to date with the latest global news in bulk cargo handling and shipping