Marine Fuels 360 China5th Biennial LNG BunkeringCleveland Cascades LtdSailors SocietyIndonesia Coal Mining 2019MULTIMODAL 2019
  • Port of Belledune
  • MULTIMODAL 2019
  • Cimbria Bulk Equipment A/S
  • 5th Biennial LNG Bunkering
  • Sailors Society
  • TBA Group

Rio Tinto details on tailings facilities

(Posted on 17/06/19)

Rio Tinto has disclosed additional information in relation to its global tailings facilities at www.riotinto.com/tailings. The latest disclosure builds on the detailed information provided on each of the company's global tailings facilities on 20 February 2019, when Rio Tinto also published its Group Procedure and its Standard for 'Management of tailings and water storage facilities', which was introduced in August 2015.

In line with the company's commitment to disclose further detail over time, Rio Tinto has now provided additional information about the construction, management and monitoring of facilities, including independent reviews.

All Rio Tinto managed facilities are subject to three levels of governance and assurance:

  • First level of assurance takes place at the asset itself with the main tenets being effective facility design, comprehensive operational controls and regular reviews. Independent reviews of the operations must be conducted at least every two years
  • Second level is assurance to the Rio Tinto Standard through periodic Business Conformance Audits and Technical Reviews, supported by Rio Tinto's Surface Mining Centre of Excellence
  • Third level of assurance is independent of site management and normally conducted by third parties

All Rio Tinto managed facilities, whether active or inactive, have an external engineer of record or design engineer.

In order to align with guidance from the International Council on Mining & Metals (ICMM) some of the information previously disclosed has been updated. This includes limiting the status classifications of facilities to 'active', 'inactive' or 'closed', and ensuring the construction method specified describes the most recent type of embankment raise on the facility. In addition, following a comprehensive review of Rio Tinto's global operations by the company's technical teams, some facilities have been reclassified resulting in some tailings facilities being added to the list and others being removed.

All facilities have been given a hazard classification in accordance with the regulatory or industry body that oversees tailings in each region or jurisdiction.

Hazard classifications are not a judgment on the condition of a facility or the likelihood of failure but on the potential consequence if there were to be a failure.

Full details of all Rio Tinto tailings and water storage facilities are available at https://www.riotinto.com/tailings.

Latest News

ArcelorMittal sale of several European assets

(Posted on 07/07/19)

ArcelorMittal has announced that it completed the sale to Liberty House Group of several steelmaking... Read more


Cargill and InnovaFeed partnership

(Posted on 07/07/19)

Cargill and InnovaFeed have entered into a strategic partnership to bring sustainable and innovative... Read more


First-ever Global Ethanol Summit

(Posted on 04/07/19)

 With the goal of engaging a broad array of global ethanol leaders about the benefits of expanding... Read more


IFA welcomes FAC code

(Posted on 04/07/19)

The International Fertilizer Association welcomes the FAO Code of Conduct, which was officially approved... Read more


Rio Tinto board change

(Posted on 27/06/19)

Dame Moya Greene has notified the Board of her intention to step down as a non-executive director of... Read more


RUSAL implements ‘BigData’ project in Siberian smelters

(Posted on 27/06/19)

RUSAL, one of the leading global aluminium producers, is launching a potroom control system as part... Read more


Hill Dickinson boosts commodities team

(Posted on 27/06/19)

Hill Dickinson has announce the strategic acquisition of two partners for its growing commodities team... Read more


BHP and Mitsubishi to reduce emissions

(Posted on 21/06/19)

BHP and Mitsubishi Development Pty Ltd have signed an MOU agreement to work together in the pursuit... Read more


CoBank outlines Swine Fever implications

(Posted on 21/06/19)

A May 2019 report from CoBank forecasts feed demand from China and Southeast Asia will drop significantly... Read more


Emissions cut on Cargill chartered fleet

(Posted on 17/06/19)

Cargill has released a collection of sustainability reports across four key businesses: Aqua Nutrition... Read more


TelestackTBA Group25th Coaltrans AsiaBühler GmbHViganPort of Stockton
  • Telestack
  • Marine Fuels 360 China
  • TMS Awards 2019
  • Bühler GmbH

Subscribe to our newsletter

Keep up to date with the latest global news in bulk cargo handling and shipping